be_ixf;ym_202404 d_19; ct_50

Direct Acting Electronic Valve Installation Instructions

Direct Acting Valve Installation

 

2-Way
  3-Way
 

 

Stacking Valve Series Assembly

 

Electrical Connections

To connect the DIN coil:

1. Remove the Philip screw from the plastic housing and unplug it from the DIN coil.

2. From the screw opening, use the screw to push the terminal block out of the plastic housing.

3. Note the 1, 2 and ground markings on underside of DIN enclosure.

4. For DC DIN Coil, Connect 1 to Positive, 2 to Negative.

5. For AC DIN Coil, connect 1 to HOT wire, 2 to Neutral wire, and if required connect ground to ground wire.

  To connect Grommet coil:

1. For DC Coil, connect the RED wire to Positive, and the BLACK wire to Negative.

2. For AC Coil, connect the BLACK wire to HOT wire, and the WHITE wire to neutral wire.

         

Remove the Philip screw from the plastic housing.  
 
    Note the 1, 2, and ground markings on the underside of the DIN enclosure.  
 
Unplug the plastic housing from the DIN coil.  
 
    For the DC DIN coil, connect 1 to positive, 2 to negative.  
 
From the screw opening, use the screw to push the terminal block out of the plastic housing.  
 
    For the AC DIN coil, connect 1 to HOT wire, 2 to neutral wire, and if required connect ground to ground wire.